Research & Development

Forty projects. Four domains. One standard of evidence.

Our R&D pipeline runs from laboratory bench to industrial deployment: harm reduction chemistry, environmental mitigation, clean energy systems and frequency research. Every project is scoped against a named harm, a measurable outcome and a compliance pathway before it advances.

Prestige Industrial Research crest — microscope, globe and gold leaf
Industrial Research
40
Active projects
4
Research domains
12
Priority programmes
36mo
Pipeline horizon

Domain 01

Drug Testing & Detection

Revolutionising how people test and understand their substances — reducing overdose risk and improving harm-reduction outcomes.

Priority 01

GHB pH-Stabilized Solution

Problem

GHB solutions degrade over time; pH drift causes overdose risk as users cannot accurately measure doses.

Solution

Buffered GHB solution that maintains pH 7.5-8.0 for 6+ months with pre-measured dosing for accuracy.

How we achieve this
  • Month 1: Formulate citrate/phosphate buffer blend
  • Month 1-2: Stability testing at various temperatures
  • Month 2-3: UV-blocking bottle packaging development
  • Month 3: Regulatory approval and market launch
Priority 02

MDMA Serotonin Support Drink

Problem

MDMA depletes serotonin; "Suicide Tuesday" is common as users lack proper recovery support.

Solution

Ready-to-drink formula with 5-HTP, tryptophan, magnesium, B-vitamins, and electrolytes for optimal recovery.

How we achieve this
  • Month 1: Formulate optimal amino acid + mineral blend
  • Month 1-2: Stability testing and taste optimization
  • Month 2-3: Packaging and regulatory approval
  • Month 3-4: Festival partnerships and launch
Priority 03

Multi-Drug Test Strips (5-in-1)

Problem

Multiple strips needed for comprehensive testing; inconvenient and costly for users.

Solution

Single strip detecting fentanyl, xylazine, benzo, nitazene, and ketamine using multiplex lateral flow technology.

How we achieve this
  • Month 1-3: Antibody selection and optimization
  • Month 3-6: Strip manufacturing and sensitivity testing
  • Month 6-9: Field testing, regulatory approval, and launch
#04

Meth Temperature-Controlled Vaporizer

Problem

Smoking meth creates pyrolysis toxins from overheating, causing additional health damage.

Solution

Digital temperature-controlled vaporizer operating in 170-210°C optimal range to prevent toxin formation.

How we achieve this
  • Month 1-3: Prototype design with temperature sensor integration
  • Month 3-6: Testing, optimization, and safety certification
  • Month 6-8: Manufacturing setup and market launch
#05

Drink Spike Test (10-Drug Panel)

Problem

Current strips only test GHB + ketamine; many drugs used for spiking remain undetected.

Solution

10-drug beverage panel including scopolamine, flunitrazepam, and other common spiking agents.

How we achieve this
  • Month 1-2: Antibody screening for 10 targets
  • Month 2-4: Strip development and extraction optimization
  • Month 4-6: Testing, approval, and launch
#06

Stimulant Comedown Recovery Kit

Problem

Ad-hoc supplements don't address all recovery needs; users take ineffective combinations.

Solution

Pre-dosed kit with NAC, vitamin C, B-complex, and magnesium for comprehensive recovery support.

How we achieve this
  • Month 1: Formulate optimal recovery blend
  • Month 1-2: Stability testing and bioavailability studies
  • Month 2-3: Packaging and regulatory approval
  • Month 3-4: Marketing and launch
#07

Fentanyl 100X Sensitivity Strips

Problem

Current strips miss low-concentration fentanyl with 20 ng/mL detection limits.

Solution

Physics-optimized strips detecting 0.2 ng/mL (100x better sensitivity) through UCSD collaboration.

How we achieve this
  • Month 1-4: Physics model optimization
  • Month 4-8: Strip manufacturing and sensitivity validation
  • Month 8-12: Field testing, regulatory approval, and launch
#08

Smart Volumetric Syringes

Problem

Manual syringe measurements have 20% error for small doses, especially with GHB/GBL.

Solution

Digital volume readout syringes for precise GHB/GBL dosing with minimal error.

How we achieve this
  • Month 1-3: Prototype design and sensor integration
  • Month 3-5: Testing and accuracy validation
  • Month 5-7: Manufacturing, certification, and launch
#09

Drug Checking Mobile App

Problem

Siloed drug checking results with no real-time data or community alerts.

Solution

App-based sample submission with real-time drug supply alerts and data aggregation.

How we achieve this
  • Month 1-3: App development and database architecture
  • Month 3-6: Integration with testing labs and beta testing
  • Month 6-9: Launch, marketing, and user acquisition
#10

Reagent Color Reader App

Problem

Subjective color interpretation in reagent testing leads to errors.

Solution

Phone camera with AI for accurate color analysis and substance identification.

How we achieve this
  • Month 1-2: Color database creation and AI training
  • Month 2-4: App development and testing
  • Month 4-6: Beta testing and launch

Domain 02

Environmental Solutions

Tackling climate change, pollution and resource depletion with technologies that scale from the home bench to industrial deployment.

Priority 01

Modular Home Direct Air Capture

Problem

Current DAC costs $600/ton CO₂; only large industrial plants exist, no home solutions.

Solution

$100/ton modular home units capturing 1 ton/year per unit with breakthrough sorbent chemistry.

How we achieve this
  • Month 1-6: Sorbent material optimization (amine-functionalized)
  • Month 6-12: Prototype testing and efficiency validation
  • Month 12-18: Manufacturing setup, regulatory approval, and launch
Priority 02

Microplastic Home Water Filters

Problem

Microplastics in drinking water with no home filtration solutions available.

Solution

Tap attachment filtering particles smaller than 10 microns using advanced membrane technology.

How we achieve this
  • Month 1-3: Membrane material selection and testing
  • Month 3-6: Prototype development and filtration testing
  • Month 6-9: Manufacturing, certification, and launch
Priority 03

Phytoremediation Services

Problem

Brownfield sites contaminated with heavy metals; cleanup costs are prohibitive.

Solution

Commercial cleanup using hyperaccumulator plants for natural, cost-effective remediation.

How we achieve this
  • Month 1-6: Plant species selection and pilot testing
  • Month 6-12: Site trials and efficiency optimization
  • Month 12-18: Commercial scaling and service launch
#04

Biodegradable Performance Plastics

Problem

Biodegradable plastics lack performance of traditional plastics for single-use items.

Solution

Performance-matched biopolymers suitable for all single-use applications.

How we achieve this
  • Month 1-6: Polymer formulation and property testing
  • Month 6-12: Performance optimization and scaling
  • Month 12-18: Manufacturing, partnerships, and launch
#05

Carbon-Negative Concrete

Problem

Concrete production accounts for 8% of global CO₂ emissions.

Solution

Mineral carbonation concrete that captures CO₂ during the curing process.

How we achieve this
  • Month 1-9: Carbonation process optimization
  • Month 9-18: Structural testing and certification
  • Month 18-24: Manufacturing setup and construction partnerships
#06

Algae Carbon Sequestration

Problem

Industrial flue gas emissions remain untreated; CO₂ continues to accumulate.

Solution

Algae bioreactors capturing CO₂ from factory emissions with valuable algae byproducts.

How we achieve this
  • Month 1-6: Algae strain selection and bioreactor design
  • Month 6-12: Pilot testing at industrial sites
  • Month 12-18: Scaling and commercial deployment
#07

Smart Irrigation Systems

Problem

Agriculture uses 70% of freshwater with highly inefficient delivery systems.

Solution

AI-optimized water delivery with IoT sensors for 50% water reduction.

How we achieve this
  • Month 1-4: Sensor development and AI algorithm creation
  • Month 4-8: Field testing and optimization
  • Month 8-12: Commercial deployment and farmer training
#08

Atmospheric Water Generators

Problem

Water scarcity in arid regions affects millions globally.

Solution

Solar-powered community water harvesters using advanced desiccant materials.

How we achieve this
  • Month 1-6: Desiccant material optimization
  • Month 6-10: Prototype testing in arid conditions
  • Month 10-15: Community pilot and scaling
#09

Urban Composting Networks

Problem

Organic waste comprises 50% of landfill, generating methane emissions.

Solution

City-wide organic waste anaerobic digestion with biogas recovery.

How we achieve this
  • Month 1-8: System design and pilot facility construction
  • Month 8-15: City-wide rollout and collection system
  • Month 15-24: Optimization and biogas utilization
#10

Vertical Farming Retrofits

Problem

Food transportation creates high carbon footprint; urban food deserts exist.

Solution

Retrofit urban buildings with hydroponic farms for local produce.

How we achieve this
  • Month 1-6: System design and nutrient optimization
  • Month 6-12: Building pilot installations
  • Month 12-18: Commercial scaling and produce distribution

Domain 03

Free & Clean Energy

Re-engineering energy generation, storage and distribution around renewable inputs and circular material flows.

Priority 01

Perovskite Solar Windows

Problem

Traditional solar panels don't work on building facades; urban energy generation limited.

Solution

30%+ efficient transparent solar windows for skyscrapers and building-integrated PV.

How we achieve this
  • Month 1-9: Perovskite formulation and transparency optimization
  • Month 9-18: Efficiency testing and stability validation
  • Month 18-24: Building pilot and commercial scaling
Priority 02

Piezoelectric Road Systems

Problem

Road infrastructure generates no energy; traffic energy is wasted.

Solution

Piezoelectric tiles in high-traffic road areas generating grid-connected power.

How we achieve this
  • Month 1-9: Material selection and tile design
  • Month 9-15: Road pilot installation and testing
  • Month 15-24: Scaling and grid integration
Priority 03

Thermoelectric Waste Heat Recovery

Problem

Industry loses 50%+ energy as waste heat; efficiency losses continue.

Solution

Thermoelectric generators capturing industrial waste heat and converting to electricity.

How we achieve this
  • Month 1-6: Material optimization and efficiency testing
  • Month 6-12: Industrial pilot installations
  • Month 12-18: Commercial deployment and scaling
#04

Solid-State Batteries

Problem

Current batteries have limited density and safety concerns; grid storage inadequate.

Solution

10x density solid-state batteries for grid storage and EV applications.

How we achieve this
  • Month 1-12: Electrolyte formulation and cell testing
  • Month 12-24: Pack assembly and cycle testing
  • Month 24-36: Manufacturing setup and commercial launch
#05

Radiative Cooling Power Generators

Problem

Solar only works during day; night energy gap exists.

Solution

Roof devices generating power from night-time radiative cooling (MIT collaboration).

How we achieve this
  • Month 1-8: Material optimization and efficiency testing
  • Month 8-15: Prototype deployment and power validation
  • Month 15-21: Manufacturing and commercial launch
#06

Wave Energy Converters

Problem

Ocean energy untapped; coastal cities need renewable power.

Solution

Grid-connected wave energy arrays for coastal city power generation.

How we achieve this
  • Month 1-12: Converter design and ocean testing
  • Month 12-24: Array deployment and grid connection
  • Month 24-36: Scaling and optimization
#07

Small Modular Reactors (SMR)

Problem

Baseload renewable power needed for cities; nuclear perception negative.

Solution

Neighborhood micro-reactors (10-50 MW) providing safe, clean baseload power.

How we achieve this
  • Month 1-18: Reactor design and safety certification
  • Month 18-36: Pilot plant construction and testing
  • Month 36-48: Commercial deployment and scaling
#08

Kinetic Energy Flooring

Problem

Public spaces generate no energy from foot traffic; energy opportunity wasted.

Solution

Piezoelectric flooring for gyms, stadiums, and transit hubs.

How we achieve this
  • Month 1-6: Tile design and energy output testing
  • Month 6-12: Venue pilot installations
  • Month 12-18: Commercial scaling and optimization
#09

Transparent Solar Windows

Problem

Buildings consume 40% of energy with no generation capability.

Solution

Organic PV windows generating power while maintaining transparency.

How we achieve this
  • Month 1-8: Organic PV formulation and transparency testing
  • Month 8-15: Window integration and efficiency validation
  • Month 15-21: Building pilots and commercial launch
#10

Hydrogen Fuel Cell Generators

Problem

Home backup power relies on diesel generators; pollution continues.

Solution

Residential hydrogen generators from electrolysis for clean backup power.

How we achieve this
  • Month 1-9: Electrolyzer design and efficiency testing
  • Month 9-18: Fuel cell integration and home pilot
  • Month 18-24: Manufacturing and commercial launch

Domain 04

Frequency & Color Spectrum

Harnessing sound, light and vibration for wellness, recovery and measured quality-of-life outcomes.

Priority 01

40 Hz Home Neurostimulation

Problem

Alzheimer's & dementia lack effective treatments; 50M+ people affected globally.

Solution

Home neurostimulation devices using 40 Hz binaural beats for brainwave entrainment.

How we achieve this
  • Month 1-3: Frequency optimization and clinical research review
  • Month 3-6: Device prototype and user testing
  • Month 6-12: Clinical trials, regulatory approval, and launch
Priority 02

Smart Circadian Lighting Systems

Problem

Sleep disorders epidemic; artificial light disrupts circadian rhythm for 1B+ people.

Solution

Full-spectrum adaptive lighting with biometric sensors for circadian optimization.

How we achieve this
  • Month 1-4: Light spectrum optimization and sensor integration
  • Month 4-8: Home pilot testing and algorithm refinement
  • Month 8-12: Manufacturing, certification, and launch
Priority 03

Sound Frequency Pain Relief

Problem

Opioid crisis continues; 200M+ people with chronic pain need alternatives.

Solution

Consumer vibroacoustic devices (40-250 Hz) for non-opioid pain relief.

How we achieve this
  • Month 1-4: Frequency mapping and clinical research
  • Month 4-8: Device development and efficacy testing
  • Month 8-12: Clinical trials, approval, and launch
#04

Full-Spectrum Home Saunas

Problem

Wellness centers expensive; home infrared options limited.

Solution

Home full-spectrum infrared saunas with color therapy integration.

How we achieve this
  • Month 1-6: IR emitter optimization and color integration
  • Month 6-10: Prototype testing and health outcome studies
  • Month 10-15: Manufacturing, certification, and launch
#05

Biometric Mood Lighting

Problem

Mental health crisis; environment affects mood but no responsive solutions exist.

Solution

RGB lighting that responds to biometric stress markers for mood optimization.

How we achieve this
  • Month 1-4: Sensor integration and color algorithm development
  • Month 4-8: Home pilot testing and mood correlation studies
  • Month 8-12: Manufacturing, app development, and launch
#06

Frequency-Specific Microcurrent

Problem

Anti-aging treatments expensive; limited home options available.

Solution

Home facial devices using frequency-specific microcurrent for skin cell stimulation.

How we achieve this
  • Month 1-4: Frequency optimization and skin testing
  • Month 4-8: Device development and efficacy studies
  • Month 8-12: Clinical trials, approval, and launch
#07

Whole-Body Vibration Recovery

Problem

Athletes need recovery; current methods are limited and expensive.

Solution

Home whole-body vibration platforms for muscle recovery and performance.

How we achieve this
  • Month 1-6: Platform design and frequency optimization
  • Month 6-10: Athlete testing and recovery outcome studies
  • Month 10-15: Manufacturing, certification, and launch
#08

Light Frequency Depression Treatment

Problem

Seasonal Affective Disorder (SAD) & depression rising; limited home treatments.

Solution

10,000 lux full-spectrum daily therapy systems for depression management.

How we achieve this
  • Month 1-6: Light spectrum optimization and clinical research
  • Month 6-10: Device testing and depression outcome studies
  • Month 10-15: Clinical trials, approval, and launch
#09

Sound Bath Home Immersion

Problem

Stress & anxiety epidemic; retreats are expensive and inaccessible.

Solution

Home multi-speaker sound immersion systems for stress reduction.

How we achieve this
  • Month 1-4: Speaker configuration and sound mapping
  • Month 4-8: Home pilot testing and stress outcome studies
  • Month 8-12: Manufacturing, app integration, and launch
#10

Full-Spectrum Healing Chambers

Problem

Holistic health fragmented; no integrated home solutions exist.

Solution

Home wellness pods combining light, sound, and vibration for integrated therapy.

How we achieve this
  • Month 1-8: System integration and therapy protocol development
  • Month 8-15: Pilot testing and health outcome studies
  • Month 15-21: Manufacturing, certification, and launch

Work with us

Partner, pilot, or license.

We collaborate with industrial operators, councils, research institutions and funders. Tell us the harm you want removed and we will scope the reformulation.

Project descriptions outline research intent and development stages. They are not product claims, offers, or regulatory approvals. Product and environmental claims are published only after internal verification against statutory and evidential standards (Fair Trading Act 1986 discipline); claims currently in review are not published.